20 Zero Energy homes

Belle-Vue Delftlanden

Emmen

Project details
ClientBelle-Vue Wonen
Contractor(s)Ursem Modulaire Bouwsystemen, Schouten Techniek
LocationEmmen
Building systemUrsem WoodCon
Type of buildingGround-level residences
Number of Modules40
Production rate7 per week
Year2019
CertificationZero Energy

 

 

This project has been finished See the project page for more information.
Go to project
2019

As an alternative to traditional wall tiles, we have chosen Fibo Trespo. The material has now been used in the first modules and the result is impressive!

In the meantime, we have also started to assemble the modules. The elements are placed on the floors poured by us, after which the modules are finished as completely as possible before they leave the factory.

The first HSB elements for project Belle-Vue Delftlanden run across the different production lines. The assembly of the modules will start next week. The floors are already ready on our platforms, together with the floor plan of the module of which the floor is a part.

A scoop! After having purchased floors for many years, we deposit the floors for Belle-Vue Emmen ourselves again! Because we still have the knowledge in house, the process runs smoothly and the floors have the desired result.

As soon as the floors have been poured, the moulds on our platforms will make room for the element construction and assembly of the modules.

Production preparations for the 20 ”Zero on the meter” homes are in full swing. Starting next week, we will be pouring the concrete floors ourselves for a total of 40 modules.