In the course of 2019 Ursem will supply 20 prefabricated houses, on behalf of Belle-Vue Energy. This will be the third delivery of Zero Energy houses to this client; this time they are destined for a new building plan in the ”Delftlanden” district at Emmen (click here for the project site).

The 105m² floor area size houses of are not connected to the gas network and have zero consumption on the electrometer due to the application of the latest installations. Besides the multi-storey house there is also a single-storey type, which will be eminently suitable as senior accommodation.

It is expected that production of the completely finished houses will take about 2 months, after which they will be fitted and assembled within 3 weeks.

 

20 Zero Energy homes

Belle-Vue Delftlanden

Emmen

Project details
ClientBelle-Vue Wonen
Contractor(s)Ursem Modulaire Bouwsystemen, Schouten Techniek
LocationEmmen
Building systemUrsem WoodCon
Type of buildingGround-level residences
Number of Modules40
Production rate7 per week
Year2019
CertificationZero Energy

In the course of 2019 Ursem will supply 20 prefabricated houses, on behalf of Belle-Vue Energy. This will be the third delivery of Zero Energy houses to this client; this time they are destined for a new building plan in the ”Delftlanden” district at Emmen (click here for the project site).

The 105m² floor area size houses of are not connected to the gas network and have zero consumption on the electrometer due to the application of the latest installations. Besides the multi-storey house there is also a single-storey type, which will be eminently suitable as senior accommodation.

It is expected that production of the completely finished houses will take about 2 months, after which they will be fitted and assembled within 3 weeks.

 

Major housing

Fully equipped

 

Factory made houses are the future, says Belle Vue Energy’s developer Danny Diemeer. This product is a completely finished house of 105m², including installed bathroom and kitchen, central heating and toilet. Light switches, baseboards, the whole package, all straight from the factory.

 

CONCRETE
Both ground floor and first floor are made of concrete and provided with floor heating. The walls have high grade insulation finished with fibre plasterboard. Testing shows that there is practically no sound transmission room-to-room, and no sound transmission between floors. Windows are all triple glazed and isolation values meet or exceed the standard.

As an alternative to traditional wall tiles, we have chosen Fibo Trespo. The material has now been used in the first modules and the result is impressive!

In the meantime, we have also started to assemble the modules. The elements are placed on the floors poured by us, after which the modules are finished as completely as possible before they leave the factory.

The first HSB elements for project Belle-Vue Delftlanden run across the different production lines. The assembly of the modules will start next week. The floors are already ready on our platforms, together with the floor plan of the module of which the floor is a part.

A scoop! After having purchased floors for many years, we deposit the floors for Belle-Vue Emmen ourselves again! Because we still have the knowledge in house, the process runs smoothly and the floors have the desired result.

As soon as the floors have been poured, the moulds on our platforms will make room for the element construction and assembly of the modules.

Production preparations for the 20 ”Zero on the meter” homes are in full swing. Starting next week, we will be pouring the concrete floors ourselves for a total of 40 modules.