In the beginning of 2020 Ursem will supply 12 prefabricated houses, on behalf of Belle-Vue Energy. This will be the fourth delivery of Zero Energy houses to this client; for the second time they are destined for a new building plan in the ”Delftlanden” district at Emmen (click here for the project site).

The 105m² floor area size houses of are not connected to the gas network and have zero consumption on the electrometer due to the application of the latest installations. Besides the multi-storey house there is also a single-storey type, which will be eminently suitable as senior accommodation.

It is expected that production of the completely finished houses will take about 1 months, after which they will be fitted and assembled within 2 weeks.

12 Zero Energy homes

Belle-Vue Delftlanden

Emmen

Project details
ClientBelle-Vue Wonen
Contractor(s)Ursem Modulaire Bouwsystemen, Schouten Techniek
LocationEmmen
Building systemUrsem WoodCon
Type of buildingGround-level residences
Number of Modules24
Production rate7 per week
Year2020
CertificationZero Energy

In the beginning of 2020 Ursem will supply 12 prefabricated houses, on behalf of Belle-Vue Energy. This will be the fourth delivery of Zero Energy houses to this client; for the second time they are destined for a new building plan in the ”Delftlanden” district at Emmen (click here for the project site).

The 105m² floor area size houses of are not connected to the gas network and have zero consumption on the electrometer due to the application of the latest installations. Besides the multi-storey house there is also a single-storey type, which will be eminently suitable as senior accommodation.

It is expected that production of the completely finished houses will take about 1 months, after which they will be fitted and assembled within 2 weeks.

Major housing

Fully equipped

 

Factory made houses are the future, says Belle Vue Energy’s developer Danny Diemeer. This product is a completely finished house of 105m², including installed bathroom and kitchen, central heating and toilet. Light switches, baseboards, the whole package, all straight from the factory.

 

CONCRETE
Both ground floor and first floor are made of concrete and provided with floor heating. The walls have high grade insulation finished with fibre plasterboard. Testing shows that there is practically no sound transmission room-to-room, and no sound transmission between floors. Windows are all triple glazed and isolation values meet or exceed the standard.

2019

The production of the elements for the 12 NoM houses in Emmen has started. After the holidays we will assemble the modules in a short period of time.