On behalf of partner Schouten Techniek, Ursem Modulaire Bouwsystemen has produced 270 prefabricated bathrooms in the Wognum factory, for a large transformation project in Amsterdam. The application of Ursem3D Bathrooms results in a significant time saving and considerable risk reduction. Snoeren bouwmanagement is managing the project.

The former office of DAS Rechtsbijstand, situated at the Karspeldreef and built in 1993, will be completely transformed from office building into student housing. The 14.153 m² building was stripped down to its structure.

Mid April 2018 the production of the fully prefabricated bathrooms was started, and only a few months later, on 20th Juli 2018 the last module left the factory. End of July the last transportation took place, followed by a period of finishing and further construction of the floors.

270 Prefab bathrooms

Karspeldreef

Amsterdam South East

Project details
ClientSchouten Techniek
Contractor(s)Ursem Modulaire Bouwsystemen
LocationAmsterdam Amsterdam South East
Building systemPrefabricated bathrooms
Type of buildingStudent complex
Number of Modules270
Production rate4 per day
Completed in2019
See the process of this project

On behalf of partner Schouten Techniek, Ursem Modulaire Bouwsystemen has produced 270 prefabricated bathrooms in the Wognum factory, for a large transformation project in Amsterdam. The application of Ursem3D Bathrooms results in a significant time saving and considerable risk reduction. Snoeren bouwmanagement is managing the project.

The former office of DAS Rechtsbijstand, situated at the Karspeldreef and built in 1993, will be completely transformed from office building into student housing. The 14.153 m² building was stripped down to its structure.

Mid April 2018 the production of the fully prefabricated bathrooms was started, and only a few months later, on 20th Juli 2018 the last module left the factory. End of July the last transportation took place, followed by a period of finishing and further construction of the floors.

Serial production

and just-in-time delivery

 

The prefabricated bathrooms are produced in series at the Ursem plant and meet all Building Code fire and noise requirements. On the outside of the bathrooms, installation company Schouten Techniek places a technical compartment with all necessary installations for central heating, ventilation, water and electricity. After testing and approval of the bathrooms they are wrapped in waterproof packaging material and prepared for transport to the building site.

The bathrooms will be delivered on the building site just-in-time, and hauled to the proper floor. To guarantee a massive floor quality, after the bathrooms are fitted on location, a sand-cement screed is applied, to be finished with floor tile.

 

TRANSFORMATION POSSIBILITIES
Office transformation gives a new function to empty office buildings, and offers many advantages. Transformation helps in solving both the shortage of housing and the office space surplus. Furthermore, less building materials are needed because less buildings are being demolished.

The municipality of Amsterdam welcomed the developer’s plans to for a change of use from office building to housing space, especially in view of the office space surplus and shortage of student housing.

Recente berichten in het process Karspeldreef

2018

In the meantime, the floors of the transformed office complex on Karspeldreef are already taking shape.

The Ursem3D Bathroom serves as the basis for the layout, to which the house and corridor separating walls can be connected.